Jump to a project
Reference results from this specific shipment.
7 days
Required door-to-door window achieved
500 km
Dedicated Paris–Lyon truck run avoided
1 day
Transfer to Lyon with same-day pickup on arrival
Explore the constraints, routing and complete result.
What the standard route could not solve
Direct air cargo flights to Lyon were unavailable. Cargo flies into Paris Airport, where terminal congestion normally causes a minimum 2day hold before cargo can be released for pickup. Standard forwarding would miss the 7day target, when cargo availability falls on weekends.
The tailored transport plan
We secured airline routing to Lyon. We reengineered the transfer plan: instead of waiting 2 days in Paris, we arranged 1day transit transfer to Lyon, with sameday pickup once cargo arrives at Lyon airport.
Result and timeline
✅ Shipment completed within the required 7day window
✅ Eliminated the cost of a 500 km dedicated overland truck run from Paris to Lyon
✅ Timeline breakdown:
2 days: Factory collection + export operation
2–4 days: Air transit (weekends included) to Lyon
1 day: Final door delivery in Lyon
Value for the client
The client avoided costly production downtime by keeping their manufacturing schedule on track. Our custom routing removed expensive longhaul trucking and cut the Paris terminal congestion risk out of their supply chain.
Reference results from this specific shipment.
35 days
Total door-to-door transit
7 + 25 + 3
Origin operations + rail + final trucking, in days
40HQ
Urgent full-container shipment
Explore the constraints, routing and complete result.
What the standard route could not solve
Stable direct rail services to Romania were not available.
The tailored transport plan
We booked direct rail service to Budapest, then arranged final trucking delivery from Budapest to the consignee’s door in Romania.
Result and timeline
Total door-to-door transit time: 35 days
Timeline breakdown:
7 days: Factory collection + export documentation & loading
25 days: Rail transit to Budapest
3 days: Final door delivery to Romania
Value for the client
The client received cargo far faster than ocean freight while avoiding the high cost of air freight. This hybrid railtruck solution balanced speed and budget for their timesensitive shipment.
Reference results from this specific shipment.
32 → 23
Spare-part packages reduced
USD 800
Approximate repacking cost
USD 2,500
Extra vessel loading charges avoided; before repacking cost
Explore the constraints, routing and complete result.
What the standard route could not solve
Loading all 32 separate sparepart packages onto the breakbulk vessel would take nearly a full day, incurring extra loading fees of approximately USD 2,500. The factory was unable to reduce the package count down to 20 by default.
The tailored transport plan
We identified a selection of spare parts that were neither heavy nor oversized. We consolidated these items into fewer packages, with a repacking cost of around USD 800.
Result and timeline
✅ Final package count reduced to 23
✅ Saved USD 2,500 in extra vessel loading charges
Value for the client
The client achieved meaningful savings on overall handling costs, including potential extra unloading fees at destination. Our packing plan avoided the high cost of loading numerous small parcels onto breakbulk tonnage while keeping the shipment compliant and vesselready.